热门标签

KPower gets four-year PPA extension

时间:1个月前   阅读:4

足球投注平台www.hg9988.vip)是皇冠体育官方投注平台,开放皇冠信用网代理申请、信用网会员开户,线上投注的官方平台。

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

PETALING JAYA: KPower Bhd’s subsidiary – PKNP KPower Suria Sdn Bhd (PKSSB) – has obtained an extension from the Energy Commission (EC) for the development of a 50MW solar photovoltaic plant in Pahang.

In a filing with Bursa Malaysia, KPower said the EC had vide its letter extended the final closing date from June 30 to Sept 30, 2022.

,

皇冠博彩www.hg9988.vip)是皇冠体育官方博彩平台,开放皇冠信博彩代理申请、博彩会员开户的线上博彩的官方平台。

,

KPower said the scheduled commercial operation date had been extended to Dec 31, 2023 from Sept 30, 2023 while the tenure of the power purchase agreement or PPA was from 21 years to 25 years.


转载说明:本文转载自Sunbet。

上一篇:足球博彩平台(www.hg108.vip):When will a general election be held?

下一篇:手机新2管理端:Bursa Malaysia closes broadly lower on continued profit-taking

网友评论